Close Menu
The Note SheetThe Note Sheet
    What's Hot

    NTPC Bongaigaon Commemorates Birth Anniversaries of Mahatma Gandhi and Lal Bahadur Shastri

    October 2, 2026

    Aditya Ispat Re-Inducts Small-Scale Industry Expert Sushila Kabra as Non-Executive Director

    October 2, 2026

    SV Trading & Agencies Reshuffles Executive Leadership with Key Board Appointments

    October 2, 2026
    Facebook X (Twitter) Instagram Threads
    Trending
    • NTPC Bongaigaon Commemorates Birth Anniversaries of Mahatma Gandhi and Lal Bahadur Shastri
    • Aditya Ispat Re-Inducts Small-Scale Industry Expert Sushila Kabra as Non-Executive Director
    • SV Trading & Agencies Reshuffles Executive Leadership with Key Board Appointments
    • Piyush Goyal Advocates for WTO-Compliant Trade Measures at G20 Trade Ministers’ Meeting in Milwaukee
    • Law Minister Arjun Ram Meghwal Leads Tree Plantation Drive at IIAC Under ‘Ek Ped Maa Ke Naam’ Campaign
    • Ministry of Steel Launches Special Campaign 6.0 for Pendency Disposal and Workplace Cleanliness
    • PM Narendra Modi Pays Homage to Former Prime Minister Lal Bahadur Shastri on Birth Anniversary
    • Gujarat Government Issues Compulsory Retirement to IAS Officers K Rajesh, Gaurav Dahiya
    Facebook X (Twitter) Instagram
    The Note SheetThe Note Sheet
    • Home
    • PMO News
    • Appointments
    • Ministry Insights
    • PSU Insights
    • Corporate News
    • MP
    • Press Release
    The Note SheetThe Note Sheet
    Home»PSU Insights»NTPC Invites ₹55.93 Crore Bids for Supplying Pond Ash to NHAI Highway Project
    PSU Insights

    NTPC Invites ₹55.93 Crore Bids for Supplying Pond Ash to NHAI Highway Project

    Rishabh SharmaBy Rishabh SharmaJuly 8, 2026No Comments3 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email Copy Link
    Follow Us
    Google News Flipboard
    Share
    Facebook Twitter LinkedIn Pinterest Email

    NEW DELHI — In a major push toward industrial waste recycling and sustainable infrastructure development, state-run power major NTPC Limited has floated a commercial tender worth ₹55.93 crore.

    The environmental logistics contract focuses on the bulk evacuation and transit of 4 lakh cubic metres of pond ash from the ash dykes of the NTPC Vindhyachal Super Thermal Power Station in Singrauli, Madhya Pradesh. The eco-friendly byproduct will be repurposed as structural filling material for the National Highways Authority of India’s (NHAI) Varanasi–Ranchi–Kolkata Highway Project.

    1. Procurement Timeline and Tender Specifics

    The bidding process is being conducted digitally via the Government e-Marketplace (GeM) portal under a competitive two-bid administrative setup:

    • Tender Identification: GEM/2026/B/7734220

    • Final Date for Submission: July 28, 2026, by 4:00 PM

    • Opening of Technical Bids: July 28, 2026, at 4:30 PM

    • Contract Outlay & Duration: The total estimated financial valuation stands at ₹55,93,13,320, with an execution window of one year and a mandatory bid validity of 120 days.

    2. Financial Guarantees and Disbursal Terms

    Prospective infrastructure and transport contractors must meet specific liquidity and security parameters to qualify for the Maharatna PSU’s project:

    • Earnest Money Deposit (EMD): Participating entities must lock in an EMD allocation of ₹1 crore.

    • Performance Security: The designated vendor will be required to submit an electronic Performance Bank Guarantee (ePBG) fixed at 5% of the total contract value.

    • Settlement Cycle: Approved payments are scheduled to be disbursed within 45 days following the clearance of online bills and the issuance of the formal Service Delivery Acceptance Certificate (SDAC).

    3. Supply Chain Logistics and Safety Norms

    The operational blueprint relies on a continuous transport pipeline to move the massive volume of thermal plant residue across state borders:

    • Logistical Framework: Movement of the 4 lakh cubic metres of pond ash will be executed under a lump-sum arrangement using the Road-Cum-Rail (RCR) mode to maintain stable supplies to the highway construction sites.

    • Statutory Compliance: The selected transport partner must strictly comply with NTPC’s operational guidelines regarding site integrity, local content parameters, anti-bribery policies, and occupational safety.

    4. Stringent Qualification Parameters

    NTPC has instituted a rigorous technical and fiscal filtering process for all applicants. Notably, the corporation has clarified that no relaxations regarding prior execution experience or minimum annual financial turnover will be granted to MSMEs or startups for this contract.

    Bidders are required to furnish validated technical capability documents, audited financial statements, PAN/GST records, and a formal site inspection certificate to clear the technical evaluation phase before July 28.

    NTPC Limited
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Rishabh Sharma

    Related Posts

    NTPC Bongaigaon Commemorates Birth Anniversaries of Mahatma Gandhi and Lal Bahadur Shastri

    October 2, 2026

    Northern Coalfields Limited Bids Farewell to 40 Retiring Officers and Personnel

    October 1, 2026

    ECL Director Chittaranjan Kumar Inspects Pandaveswar Coalfields

    September 30, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Economy News

    NTPC Bongaigaon Commemorates Birth Anniversaries of Mahatma Gandhi and Lal Bahadur Shastri

    By Rishabh SharmaOctober 2, 2026

    BONGAIGAON (ASSAM) — State-run power utility NTPC Bongaigaon observed the birth anniversaries of Father of…

    Aditya Ispat Re-Inducts Small-Scale Industry Expert Sushila Kabra as Non-Executive Director

    October 2, 2026

    SV Trading & Agencies Reshuffles Executive Leadership with Key Board Appointments

    October 2, 2026
    Top Trending

    NTPC Bongaigaon Commemorates Birth Anniversaries of Mahatma Gandhi and Lal Bahadur Shastri

    By Rishabh SharmaOctober 2, 2026

    BONGAIGAON (ASSAM) — State-run power utility NTPC Bongaigaon observed the birth anniversaries…

    Aditya Ispat Re-Inducts Small-Scale Industry Expert Sushila Kabra as Non-Executive Director

    By Rishabh SharmaOctober 2, 2026

    HYDERABAD — Industrial steel manufacturer Aditya Ispat Limited has formally renewed the…

    SV Trading & Agencies Reshuffles Executive Leadership with Key Board Appointments

    By Rishabh SharmaOctober 2, 2026

    MUMBAI — Capitalizing on corporate governance updates, SV Trading & Agencies Limited…

    Advertisement
    Demo

    TheNotesheet.in It should be:
    India’s Governance & Institutional Intelligence Tracker.

    Contact Us
    The Note Sheet
    Email - office.unitedassociates@gmail.com

    Facebook X (Twitter) Instagram YouTube
    Services
    • Home
    • Appointments
    • Corporate News
    • Ministry Insights
    • PMO News
    • PSU Insights
    Coverage
    • Home
    • Appointments
    • Corporate News
    • Ministry Insights
    • PMO News
    • PSU Insights
    Facebook X (Twitter) Instagram Pinterest
    • Home
    • Appointments
    • Corporate News
    • Ministry Insights
    • PMO News
    • PSU Insights
    © 2026 United Associates. Designed by SocialFox.

    Type above and press Enter to search. Press Esc to cancel.